SHENZHEN DHX TECHNOLOGY LIMITED

YOUYI YY-D-200-5 V-K

Additional information

Unite price:

All of our company’s YOUYI POWR SUPPLY are products of YOUYI company. We are just their large agent. Our company  provides 7*24 hours after-sales services 

MODEL YY-D-200-5 V-K
OUTPUT DC VOLTAGE 5V
RATED CURRENT A1 40A(Input Voltage:100V~175V)
RATED CURRENT A2 40A(Input Voltage:176V~240V)
CURRENT RANGE 0~40A
RATED POWER 200W
RIPPLE&NOISE ≤100mV
VOLTAE ADJ.RANGE ±0.2V
VOLTAGE TOLERANCE ±1%
LINE REGULATION ±0.5%
LOAD REGULATION ±2.0%
SET UP TIME 50mS
HOLD UP TIME 20mS
INPUT VOLTAGE RANGE 100V~240V
FRE.RANGE 47-63Hz
EFFICIENCY 91%
POWER FACTOR PF>0.99/110V(Full Load),

Thank you for reading this post, don't forget to subscribe!

PF>0.97/220V(Full Load)

INRUSH CURRENT ≤60A
LEAKAGE CURRENT ≤2.0mA
PROTECTION INPUT UNDERVOLTAGE 80V~85V
INPUT OVER VOLTAGE 270V~280V
INPUT OVER CURRENT 3A
OUTPUT OVER VOLTAGE 5.75V~7.5V(Re-start)
OUTPUT LIMIT CURRENT 44A~52A
OVER TEMPERATURE 95℃±5℃
THERMAL METHODS Cooled by air
ENVIRONMENT WORKING TEMP. —30℃~+60℃
WORKING HUMIDITY 20~90%RH
STORAGE TEMP.,HUMDITY —40℃~+80℃,10~95%RH
TEMP.COEFFICIENT ±0.03%/℃(0~50℃)
VIBRATION 10-300MHz,1G,10 min./1 cycle,
Period for 60min each axes.
SAFETY SAFETY STANDARDS GB4943、UL60950、EN60950
EMC STANDARDS GB9254、EN55022A
WITHSTAND VOLTAGE I/P-O/P:3KVAC/3mA/1min
I/P-FG:1.5KVAC/3mA/1min
O/P-FG:0.5KVAC/3mA/1min
ISOLATION RESISTANCE I/P-O/P:100MΩmin/500VDC
CERTIFICATION CQC/ CE/ CB/ ROHS/CCC
OTHERS DIMENSION 142*60*30mm

 

Production Process of LED Modules

Step 1

Put the circuit board in the fixture and then place it under a gravity tool to flatten it to the same level.

Step 2

Use a tin brushing machine to evenly brush solder paste on the IC or lamp positions.

.

Step 3

To ensure quality assurance, use testing machines to check if the solder injection points on the circuit board have been coated with solder paste.

Step 4

high-speed SMT machine can produce up to 1000 LED modules per day, ensuring timely delivery for our customers.

Step 5

Use reflow soldering to fix the leds, ICs, capacitors and resistors on the circuit board.

Step 6

To ensure quality assurance,after fixing all components to circuit board, Will manually test the performance of LED modules.

Step 7

Automatic Screw Machine: Use the screw machine to fix the circuit board with the bottom shell.

Step 8

Automatic glue machine: Using an automatic glue machine to glue outdoor LED screen modules to achieve IP65 waterproof level.

Step 9

The third door to quality assurance:Check the sealing condition of each module to ensure 100% waterproofing of the product.

Step 10

The fourth step in quality assurance is to manually test the performance of the finished LED screen module.

Step 11

Aging test: The finished led screen module undergoes a 48 hours aging test to ensure product quality.

Ask For A Quick Quote

We will contact you within 1 working day, please pay attention to the email with the suffix”@dhxsigns.com“.

Your email information is absolutely safty and we must not disclose it to third parties for any reason!

Get more information

We will contact you within 1 working day, please pay attention to the email with the suffix”@dhxscreen.com“.

Get more information

Fill out the form below, and we will be in touch shortly.